Integrated LNG Refilling Skid With Tank And Dispenser
- Sinogas repower
- China
- 30 days
- 1000 units per year
Integrated LNG Refilling Skid where functions are highly integrated on the skid which can achieve quick on-site installation and LNG fueling services directly.
1. High assembly, integrated design, small required area;
2. Pre-assemble, inspect strictly, small installation work on site, can put into use quickly;
3. Container similar design, it is easy to transport, good mobility;
4. Advanced procedure, has a good speed unloading and filling;
5. The key parts are imported, the electrical system is explosion-proof design, safety and reliable;
6. PLC auto control, human machine interface is very well, easy to operate.
Product Description:
Modular design is applied to LNG dispenser, storage tank, submerged pump, vaporizer, piping and control system, etc. And different modules can be integrated according to the construction requirements together with process pipelines and electrical devices.
LNG refilling station is equipped with reliable self-developed control system, alarm system and safety relief system.
Data Sheet:
Device name | Specification |
Unloading pressure booster | 300Nm/h |
EAG heater | 150Nm/h |
Submerged pump | TC34 1*2*6-2VSL |
Mute oil-free compressor | PL series |
LNG dispenser | Domestic famous brand |
Low temperature long handle cut-off valve | Domestic famous brand |
Explosion-proof solenoid valve | F33-03EX DC24-10 |
converter | ABB |
PLC of Siemens | S7-300 |