CNG Pressure Regulator and LNG Regasification Stations

  • Customized Design LNG Regasification Skid

    Customized Design LNG Regasification Skid

    Advantages and features for LNG regasification skid:
    1) Highly integrated and integrated design, small occupying area, easily on-site installation and put into production quickly.
    2) PLC automatic control, friendly human-computer interface, convenient operation.
    3) Provide running protection effectively and realize the dynamic monitor for the working process.
    4) Skid-mounted design make the transportation and move easily, also has good maneuverability.
    5) Anti-explosive electrical system, safe and reliable.
    6) Short process pipeline has the less running cost and quick start.
    7) Pressure LNG storage tank and LNG transportation lorry, quick pressurization speed and convenient adjustment, increase the unloading speed effectively.

    Email Details
  • City Gas Gate Station

    City Gas Gate Station

    Technical features:
    1. City gas gate station flow capacity range from 4,000NM3/h to 200,000NM3/h in single skid available;
    2. Pressure regulator inlet pressure from 20 bar ~100 bar, outlet pressure based on customer requirements, from 4-7 bar;
    3. The PRMS with over pressure, over temperature protection system;
    4. City gas, industrial gas distribution plant with electric heating and gas boiler heating options;
    5.Customized design and reliable performance for different environment and working conditions.

    Email Details
  • CNG Mass Flow Regulation Station 5000NM3/h

    CNG Mass Flow Regulation Station 5000NM3/h

    Technical features:
    1. CNG PRU Flow capacity range from 100NM3/h to 10,000NM3/h in single skid available;
    2. CNG pressure regulator inlet pressure from 250 Bar, 200 Bar, outlet pressure based on customer requirements, from 100 Kpa to 20 Bar;
    3. CNG pressure reducing system with over pressure, over temperature, gas leakage ESD system. Low water level, gas leakage alarm system available;
    4. With electric heating and gas boiler heating options;
    5. Customized design and reliable performance for different environment;

    Email Details
  • Hot
    Pressure Regulator 1000NM3/H For Industrial Gas

    Pressure Regulator 1000NM3/H For Industrial Gas

    With more than 20 years experienced for gas regulation and treatment equipment.

    Experienced technician team for commission and after service work.

    Email Details
  • LNG Fast Supply Equipment

    LNG Fast Supply Equipment

    Feature:
    1. LNG skid mounted regasification station flow capacity can be designed from 1,000 Nm³/hr to 20,000 Nm³/hr.
    2. LNG transfer to gas in 30 minutes, highly integrated equipment, super easy installation;
    3. 20FT skid flow capacity reach to 1,000Nm³/hr, 40FT skid flow capacity reach to 5,000Nm³/hr , it can be designed as transportable equipment;
    4. Perfect solution for LNG gas peak shaving and emergency gas supply;
    5. For big flow capacity peak shaving station, like 10,000 Nm³/hr to 20,000 Nm³/hr, total investment one tenth of traditional ambient temperature evaporator solution;
    6. LNG gas quick supply system with over pressure, over temperature ESD system and Low water level, gas leakage alarm system available. Automatic PLC control;
    7. One skid integrated LNG defuel booster, heat exchanger, burner, LNG evaporator, pressure regulator, chimney etc, all in one solution;
    8. LNG/LPG dual fuel available.

    Email Details
  • Pressure Regulator 100NM3/H For Industrial Gas

    Pressure Regulator 100NM3/H For Industrial Gas

    High quality with reliable performance with more than 800 stations operation in China.

    With NDT testing for all welding seam, with three years quality warranty time.

    Available after serive by experienced technician during commissioning.

    Email Details
  • LNG Evaporator Skid With Capacity 7000NM3/H

    LNG Evaporator Skid With Capacity 7000NM3/H

    Technical feature:
    1. LNG evaporator flow capacity from 3,000 Nm³/hr to 10,000 Nm³/hr;
    2. LNG regasification station can be design as ASME standard;
    3. Each part of LNG gasification station are skid mounted design, easy transportation, installation and maintenance;
    4. Over pressure, over temperature ESD system and Low water level, gas leakage alarm system available. Automatic PLC control;
    5. The whole system with LNG trailer/tank defuel booster, heat exchanger, flow meter, pressure regulator, chimney, odorization etc, complete function.

    Email Details
  • CNG Pressure Reducing And Metering Station 2000NM3/h

    CNG Pressure Reducing And Metering Station 2000NM3/h

    Technical features:
    1. CNG PRU Flow capacity range from 100NM3/h to 10,000NM3/h in single skid available;
    2. CNG pressure regulator inlet pressure from 250 Bar, 200 Bar, outlet pressure based on customer requirements, from 100Kpa to 20 Bar;
    3. The CNG pressure reducing system with over pressure, over temperature, gas leakage ESD system. Low water level, gas leakage alarm system available;
    4. Usually Gas boiler heating method is first option;
    5.Customized design and reliable performance for different environment

    Email Details
  • CNG Pressure Reducing And Metering Station 1000NM3/h

    CNG Pressure Reducing And Metering Station 1000NM3/h

    Technical features:
    1. CNG PRU flow capacity range from 100NM3/h to 10,000NM3/h in single skid available;

    2. CNG pressure regulator inlet pressure from 250Bar, 200Bar, outlet pressure based on customer requirements, from 100Kpa to 20Bar;

    3. The CNG pressure reducing system with over pressure, over temperature, gas leakage ESD system. Low water level, gas leakage alarm system available;

    3. PRMS with electric heating and gas boiler heating options;

    4. Customized design and reliable performance for different environment;

    Email Details
  • 1
  • 2
  • >
  • Total 11 Records
Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy