LNG regasification station
Brand Sinogas repower
Product origin China
Delivery time 30 days
Supply capacity 1000 units per year
LNG regasification skid is Skid-mounted design that make the transportation and move easily, also has good maneuverability. Highly integrated and integrated design, small occupying area, easily on-site installation and put into production quickly.
Customized Design LNG Regasification Skid
Brand: Sinogas Repower
Product origin: China
Delivery time: 30 days
Supply capacity: 1000 units per year
Advantages and features for LNG regasification skid:
1) Highly integrated and integrated design, small occupying area, easily on-site installation and put into production quickly.
2) PLC automatic control, friendly human-computer interface, convenient operation.
3) Provide running protection effectively and realize the dynamic monitor for the working process.
4) Skid-mounted design make the transportation and move easily, also has good maneuverability.
5) Anti-explosive electrical system, safe and reliable.
6) Short process pipeline has the less running cost and quick start.
7) Pressure LNG storage tank and LNG transportation lorry, quick pressurization speed and convenient adjustment, increase the unloading speed effectively.