Skid Mounted LNG Refilling Station
- Sinogas repower
- China
- 30 days
- 1000 units per year
LNG quickly-mounted refilling station where functions are highly integrated on the skid which can achieve quick on-site installation and LNG fueling services directly.
1. High assembly, integrated design, small required area;
2. Pre-assemble, inspect strictly, small installation work on site, can put into use quickly;
3. Container similar design, it is easy to transport, good mobility;
4. Advanced procedure, has a good speed unloading and filling;
5. The key parts are imported, the electrical system is explosion-proof design, safety and reliable;
6. PLC auto control, human machine interface is very well, easy to operate.
Product Description:
Modular design is applied to LNG dispenser, storage tank, submerged pump, vaporizer, piping and control system, etc. And different modules can be integrated according to the construction requirements together with process pipelines and electrical devices.
LNG refilling station is equipped with reliable self-developed control system, alarm system and safety relief system.
Data Sheet:
Item | Content |
Capacity of liquid filling | 18m3/h, 36Nm3/h |
Total power | 15kw, 25kw |
Working pressure/total water capacity of LNG tank | According to customer requirements |
Flow of LNG submerged pump/power of single set | 340L/min, ≤11kw |
Pressurization/regulating vaporizer | 300Nm3/h, 1.6Mpa |
Control modePLC | PLC(Programmable logic control) automatic control |
Working cycle | Continuous |
Explosion-proof grade | dⅡBT4 |
Security system | Flammable gas and flame alarm, ESD interlock protection |